Fire sprinkler sub for Maryland general contractors: what we need to bid your job.
A general contractor pricing a job in Maryland needs a sprinkler number that still holds after the permit set comes back.
That number depends on what the estimator sends with the request. This page is written to the GC and the estimator. It covers what to send, what the price carries, which scope lines to settle before bid day, and how the sprinkler work fits around the ceiling and the final in Montgomery, Prince George’s, Baltimore City and County, Anne Arundel, Howard and Frederick.
The jobs we bid as the sprinkler sub
- Tenant fit outs. Walls and ceilings change in a space that already has sprinklers, and heads get moved or added. Our guide to moving heads for a tenant fit out covers that job on its own.
- New buildings, additions and shells. A full system designed with the building. The steps are in our guide to commercial fire sprinkler installation.
- A change of use. A store that becomes a restaurant, or a house that becomes an assisted living home, where the new use can bring sprinklers into a building that never had them.
- Houses and townhouses. Custom homes, additions and accessory dwelling units built to the residential standard.
Have a set on your desk and not sure whether it has sprinkler scope in it? Text the code summary sheet and the address to (240) 222-5257 and we will tell you what the building needs before you carry a number for it.
What to send for a number
A sprinkler price built from a floor plan alone is carrying guesses about the water and the ceilings. This is the list that takes the guesses out.
- The architectural set. The code summary sheet, the floor plans and the reflected ceiling plans. The ceiling plan is the sheet the head layout is drawn from.
- The sprinkler sheets or the spec section, if there are any. Some sets carry engineered sprinkler drawings. Many carry one note that the sprinkler contractor designs the system. We need to know which one we are pricing.
- What each room is used for. Room names, ceiling heights, and how high anything will be stored. Montgomery County asks for the room name on tenant drawings, not a hazard class, and a ceiling height for every space.
- The water information.A flow test, the utility’s hydraulic sheet, or the civil plan showing a new water service. For a fit out, a photo of the hydraulic data plate at the riser does the same job.
- The existing system, on a renovation. A few photos of the riser, the pipe above the ceiling and a head up close, plus any old sprinkler drawings the landlord has.
- Where the building permit stands. The permit number, or the date it was filed.
- The schedule. The bid date, the start date, when the ceiling grid goes in, and whether any part of the building is occupied during the work.
- The landlord’s rules. Shutdown notice, working hours, and whether the building has its own required vendors.
Missing half of that list on bid week is normal. Text what you have to (240) 222-5257, a phone photo of the sheets is fine, and we will tell you which missing piece moves the number and which one we can carry as an open item.
What sets how fast a bid comes back
It depends on the set. A fit out with a clear reflected ceiling plan and a few photos of the existing pipe is a short takeoff. A new building with no water information takes longer, because the pipe sizes depend on a flow test nobody has run yet, and the choice is to wait for the test or to price it with the water named as an open item.
Three things move a request to the front of the pile. The bid date is in the first line. The drawings are one download, not six emails. And the estimator says whether this is a budget number for a client or a hard bid with a date on it. Have a bid due? Call or text (240) 222-5257 with the bid date and we will tell you up front whether we can make it.
What the number carries
State law says nobody may provide services as a fire sprinkler contractor in Maryland without a license from the State Fire Marshal. On our jobs the licensed sprinkler contractor on the job designs the system, installs it and pulls the permit. Montgomery County wants that contractor licensed with the state and with the county, and it wants both license numbers and the expiration date on the drawings. A GC who has to list subs on a bid form can ask us for those numbers with the proposal.
A written proposal from us carries these lines.
- The sprinkler drawings and the hydraulic calculations where the job needs them.
- The sprinkler permit application and the county’s review comments.
- Pipe, fittings, hangers and heads, installed.
- The pressure test and the inspection before the ceiling closes.
- The final inspection with the county.
The design and the permit are inside the price. The GC does not have to hire a separate engineer for the sprinkler sheets or stand in line at the permit counter for them.
Scope lines to settle before bid day
Most sprinkler change requests come from a line nobody claimed. These are the ones worth a sentence each in the scope sheet.
- The fire alarm. The flow switch and the valve supervision report to the alarm panel, and the alarm is a separate permit and usually a separate trade. In Montgomery County the fire alarm is not part of the fire protection system permit. Anne Arundel issues its own alarm permits. Say who carries the wiring and the monitoring.
- The underground. A new fire service line from the street is its own scope with its own inspections. In Anne Arundel County it is inspected under the plumbing permit before the backflow preventer goes on.
- The fire pump, if there is one. Power to the pump and the controller sits with the electrician. Montgomery County treats every pump installation as its own permit and submittal.
- Permit and review fees. The county sets them. Say whether the bid carries them or the owner pays them direct.
- Ceiling tile, patching and paint. Who pulls and replaces tile in an occupied space, and who patches drywall where pipe passes through.
- After hours work and shutdowns. A fit out in an occupied building usually means the system is drained and refilled around the other tenants.
Our proposal names each of those lines as included or by others, so the estimator can see the gaps before the bid goes in. Leveling two sprinkler numbers that are far apart? Text both scope sheets to (240) 222-5257 with the prices blacked out and we will tell you which lines one of them left off.
Where the sprinkler permit sits in the schedule
The sprinkler permit is its own application, and the order matters to the schedule more than the review time does.
- Prince George’s County.The building permit has to be issued first. The sprinkler application cannot run in parallel with it. After that, the county’s own estimate for a sprinkler or fire alarm permit is about five business days. A commercial job of ten heads or fewer that does not move a main or a riser still needs the permit, but no plans go in for review.
- Anne Arundel County. Same order. The sprinkler permit is applied for after the building permit is issued.
- Montgomery County.No sprinkler work may start until the permit is issued. The county’s goal for regular plans is two weeks. A single floor of no more than 5,000 square feet with no calculations can go through its fast track review.
- Baltimore City. The Fire Department gives 10 to 25 business days for a first review and 5 to 10 for a resubmittal.
- Baltimore County. A permit from Permits, Approvals and Inspections is required before a system is installed or altered.
Put the sprinkler drawings and the review on the schedule as their own bars, starting the day the building permit is issued. A sprinkler sub awarded after the framing starts puts the drawings and the review behind the ceiling crew. Our county guides cover where the application goes in Montgomery, Prince George’s, Baltimore County, Baltimore City, Anne Arundel and Frederick.
Working around the ceiling
The superintendent’s question is always the same. When can the ceiling close? The answer is after the sprinkler inspection, and the counties leave no room on that.
- Baltimore County will not inspect a sprinkler system unless all the piping is exposed, and looking over ceiling tile from a ladder does not count unless the Fire Marshal approves it ahead of time. The approved plans have to be on site.
- Anne Arundel County inspects before the ceiling closes, and the inspector has to be able to see the whole new installation.
- Both counties want a pressure test on a job over 20 sprinklers, and both ask for the inspection request at least three working days ahead.
So the sprinkler pipe goes in after the framing and alongside the ductwork, the inspection is called in before the grid crew is due, and the heads are set to the finished ceiling once it is in. Two things on the GC’s side keep that moving. Send the mechanical and lighting layouts as soon as they exist, because ducts, lights and bulkheads in the way of the spray go on the sprinkler sheets. And tell us when a ceiling height or a wall moves after the drawings are approved, because the installation has to match the approved plans at the inspection.
Ceiling crew already scheduled and the sprinkler inspection is not on the calendar yet? Call or text (240) 222-5257 with the county and the date and we will tell you what has to happen before the tile goes up.
The final and the turnover
The sprinkler final comes after the ceilings, walls and fixtures are done. Anne Arundel County spells out what the inspector expects. The system is fully operational and tied into the fire alarm, no head is blocked or painted, and every valve and control is labeled. Baltimore County says painted sprinklers must be replaced, so the painter needs to know the heads are there before the sprayer comes out.
The alarm is where finals slip. Both trades have to be ready for the same inspection, and the sprinkler final then feeds the Use and Occupancy inspection that lets the tenant open. In an occupied building, any shutdown along the way has to be planned with the landlord. Howard County requires a fire watch for a system out of service more than four hours. Final on the calendar and something on the sprinkler side is still open? Call or text (240) 222-5257 with the permit number and we will tell you what the inspector needs to see.
What drives the price
- The head count and the pipe. How many heads move or go in, and whether the branch lines feeding them have to change.
- The use. An open office takes less water than a stockroom with high racks, and the pipe is sized to match.
- The water supply. A strong main keeps pipe sizes down. A fire pump or a tank is the largest single add on any job.
- The ceiling. Height, type, and how much of the structure is open while the pipe goes in.
- Calculations. A job that needs new hydraulic calculations is more design time and a longer review.
- Access and hours. An occupied building, night work and shutdowns around other tenants.
- County fees. Permit, review and inspection fees are set by the county.
Two spaces of the same size can land far apart on those seven lines, so we price from the drawings and put it in writing. Call or text (240) 222-5257 with the set and the bid date and we will send a written number that says what is included.
Where we work
We bid sprinkler work for general contractors in Montgomery, Prince George’s, Baltimore City, Baltimore County, Anne Arundel, Howard and Frederick. Our page on commercial fire sprinkler systems in Maryland covers inspections, repairs and backflow testing for the owner after the job is turned over.
Bidding a job with sprinkler scope?
Text the plan set and the bid date to (240) 222-5257. We tell you what the sprinkler scope is and send a written number with the design and the permit in it.